CSI MasterFormat divisions: the complete list, explained

All 50 CSI MasterFormat divisions in one table, what each covers, how section numbers work, and how the old 16-division list maps to today's.

Exploded 3D model of a commercial building separated into layers: foundation, steel frame, exterior walls, interiors and MEP systems
On this page
  1. What are CSI divisions?
  2. The complete list of MasterFormat divisions
  3. What each group covers, in plain terms
  4. How MasterFormat numbers work
  5. The old 16 divisions vs. today’s 50
  6. MasterFormat vs. UniFormat
  7. Why CSI divisions matter for estimating

If you’ve ever opened a project manual or a bid package, you’ve seen numbers like 03 30 00 or Division 09. Those come from MasterFormat, the standard used across the US and Canada to organize construction specifications, bids and cost data by type of work.

This guide lists every MasterFormat division, explains how the numbering works, and shows how the old 16-division system maps to the current one.

What are CSI divisions?

MasterFormat is published by the Construction Specifications Institute (CSI) and Construction Specifications Canada (CSC). It sorts all construction work into numbered divisions, such as Concrete, Masonry, Electrical and Earthwork. Most people simply call them “CSI divisions” or “CSI codes.”

Because everyone uses the same numbers, the architect’s specifications, the general contractor’s bid, the subcontractors’ quotes and the estimator’s takeoff can all be lined up division by division. When a spec says “see Section 08 71 00,” everyone knows it’s door hardware.

The complete list of MasterFormat divisions

MasterFormat has 50 division numbers, 00 through 49. Some are reserved (left empty on purpose) so the system can grow without renumbering.

Procurement and contracting requirements

Division Title
00 Procurement and Contracting Requirements

General requirements

Division Title
01 General Requirements

Facility construction

Division Title
02 Existing Conditions
03 Concrete
04 Masonry
05 Metals
06 Wood, Plastics, and Composites
07 Thermal and Moisture Protection
08 Openings
09 Finishes
10 Specialties
11 Equipment
12 Furnishings
13 Special Construction
14 Conveying Equipment
15–19 Reserved

Facility services

Division Title
20 Reserved
21 Fire Suppression
22 Plumbing
23 Heating, Ventilating, and Air Conditioning (HVAC)
24 Reserved
25 Integrated Automation
26 Electrical
27 Communications
28 Electronic Safety and Security
29 Reserved

Site and infrastructure

Division Title
30 Reserved
31 Earthwork
32 Exterior Improvements
33 Utilities
34 Transportation
35 Waterway and Marine Construction
36–39 Reserved

Process equipment

Division Title
40 Process Interconnections
41 Material Processing and Handling Equipment
42 Process Heating, Cooling, and Drying Equipment
43 Process Gas and Liquid Handling, Purification, and Storage Equipment
44 Pollution and Waste Control Equipment
45 Industry-Specific Manufacturing Equipment
46 Water and Wastewater Equipment
47 Reserved
48 Electrical Power Generation
49 Reserved

CSI updates MasterFormat from time to time. For contract documents, always work from the edition named in the project manual; CSI’s MasterFormat page has the current edition.

What each group covers, in plain terms

  • Divisions 00–01 aren’t physical work. They hold the bidding requirements, contract forms and general requirements: things like submittal procedures, temporary facilities, quality control and project closeout.
  • Divisions 02–14 are the building itself: structure, envelope, interiors and built-in equipment. This is where most of a general contractor’s takeoff lives.
  • Divisions 21–28 are the building systems: fire protection, plumbing, HVAC, electrical, low-voltage and security. Together these are usually called MEP.
  • Divisions 31–35 are everything outside the building: earthwork, paving, landscaping, site utilities and heavy civil work.
  • Divisions 40–48 cover industrial process equipment, used mostly on plants, treatment facilities and manufacturing projects.

How MasterFormat numbers work

Each specification section has a six-digit number written in three pairs:

03 30 00 Cast-in-Place Concrete

  • 03 is the division (Concrete)
  • 30 is the level-2 group within the division (cast-in-place concrete)
  • 00 is the level-3 detail; when it’s 00, the section covers the whole group

A more specific example is 09 29 00 Gypsum Board, which sits in Division 09, Finishes. Some sections add a fourth level after a decimal point for even more detail.

You don’t need to memorize the numbers. What matters is knowing which division a piece of work belongs to, so it’s specified, priced and bid in the right place.

The old 16 divisions vs. today’s 50

Before 2004, MasterFormat had 16 divisions, and many contractors still talk in those terms. In the 2004 edition, CSI expanded it to 50 so systems like fire suppression, communications and earthwork could each have their own division.

Old division (16-division format) Where it lives now
1 General Requirements 01 General Requirements
2 Site Construction 02 Existing Conditions and 31–35 Site and Infrastructure
3 Concrete 03 Concrete
4 Masonry 04 Masonry
5 Metals 05 Metals
6 Wood and Plastics 06 Wood, Plastics, and Composites
7 Thermal and Moisture Protection 07 Thermal and Moisture Protection
8 Doors and Windows 08 Openings
9 Finishes 09 Finishes
10 Specialties 10 Specialties
11 Equipment 11 Equipment
12 Furnishings 12 Furnishings
13 Special Construction 13 Special Construction
14 Conveying Systems 14 Conveying Equipment
15 Mechanical 21 Fire Suppression, 22 Plumbing, 23 HVAC
16 Electrical 26 Electrical, 27 Communications, 28 Electronic Safety and Security

So when an older contractor says “Division 15,” they mean the mechanical trades that are now split across Divisions 21, 22 and 23.

MasterFormat vs. UniFormat

You may also see UniFormat, another CSI standard. The difference:

  • MasterFormat organizes by type of work or material (concrete, masonry, electrical). It’s used for specifications, bids and detailed estimates.
  • UniFormat organizes by building element or system (foundations, exterior walls, roofing). It’s often used for early, conceptual estimates before the design is detailed.

Why CSI divisions matter for estimating

Organizing a takeoff by CSI division does three useful things:

  1. Nothing gets missed. Walking through the divisions one by one works as a checklist against the specifications.
  2. Scopes are easy to send out. Each division, or group of divisions, becomes a package for the right subcontractor to price.
  3. Bids compare cleanly. When every quote follows the same structure, comparing them line by line is straightforward.

That’s how we organize every takeoff, and how our services are grouped too:

New to takeoffs? Start with what a takeoff in construction is, and how it differs from an estimate.

Abdullah Fazal

IT & SEO Specialist

Abdullah runs The Best Estimator's website, IT systems and SEO, and writes our guides for contractors together with our estimators, explaining takeoffs, bidding and BIM in plain language.

Reviewed for accuracy by Ismail Ijaz, Chief Executive Officer.

LinkedIn

Send us your drawings.

Tell us about your project and we'll reply with a quote.

  1. Send your drawings

    PDF, DWG, ZIP or XLSX. Any trade, any size.

  2. We measure every trade

    Each takeoff is checked by a second estimator.

  3. Get your takeoff

    Excel quantities and marked-up plans in 24–48 hours.