The Best Estimator
Home Samples Services Pricing About
Theme Mode

Equipment & Specialty Construction

Purpose-built structures and process equipment that fall outside standard building trades — from conveying systems to special-use facilities.

CSI division
Div. 13-14, 40–48
Turnaround
24–48 hours
Files we accept
PDF, DWG, ZIP, XLSX
3D model of a pre-engineered steel building frame with bracing and column base plates

What we measure

  • Conveying systems — elevators, escalators, lifts
  • Special construction — pre-engineered buildings, fabric structures
  • Process and material handling equipment
  • Building specialties and furnishings quantities
  • Loading dock and industrial equipment takeoffs

What you receive

Itemized quantity takeoff spreadsheet

Equipment schedule with specification references

Material and labor unit breakdowns

Where it's used

Industrial and warehouse facilities, pre-engineered metal buildings, specialty process/manufacturing projects.

Send us your Specialty drawings.

Upload PDF, DWG, ZIP or XLSX files. Delivered in 24–48 hours.

Get a quote