Electrical estimating: how to estimate electrical work step by step
How to build an electrical estimate from the drawings: the takeoff, conduit and wire, labor units and pricing, with a worked example for a small office fit-out.
On this page
- What goes into an electrical estimate
- Step 1: Gather the electrical drawings and specs
- Step 2: Count devices and fixtures (the electrical takeoff)
- Step 3: Measure conduit and wire
- Step 4: Take off the gear and feeders
- Step 5: Apply labor units
- Step 6: Price the material
- Step 7: Add the job costs and markup
- Worked example: a small office fit-out
- Can you estimate electrical work by the square foot?
- Common electrical estimating mistakes
- Frequently asked questions
- Get your electrical takeoff done from the drawings
Electrical estimating means working out what an electrical job will cost before you bid it: every device, fixture, foot of conduit and wire, piece of gear, and the labor hours to install them. An electrical estimate is built in two parts. First the electrical takeoff counts and measures everything on the drawings. Then labor units and material prices turn those quantities into dollars. This guide walks through how to estimate electrical work step by step, the way an estimator does it, and ends with a worked example.
What goes into an electrical estimate
Electrical work is CSI Division 26, with communications in Division 27 and fire alarm and security in Division 28 (see our CSI MasterFormat divisions guide). A complete electrical estimate usually has these parts:
| Part | Measured in |
|---|---|
| Devices: receptacles, switches, sensors | Each (EA) |
| Light fixtures and exit/emergency lights | Each, by fixture type |
| Conduit, by type and size | Linear feet (LF) |
| Conduit fittings: couplings, connectors, straps, elbows | Each |
| Wire and cable, by size and type | LF |
| Boxes, rings and covers | Each |
| Gear: panelboards, switchboards, transformers, disconnects | Each |
| Feeders: conduit and wire from gear to gear | LF |
| Labor to install all of the above | Hours, from labor units |
| Extras: lifts, permits, temporary power, testing | Lump sum or by time |
On most electrical jobs, labor is the biggest number on the estimate, and the number that’s easiest to get wrong. That’s why labor units get their own step below.
Step 1: Gather the electrical drawings and specs
Electrical information is spread across more sheets than most trades:
- Lighting plans: fixture locations, fixture type tags and switching.
- Power plans: receptacles, equipment connections and circuit numbers.
- Fixture schedule: the make, model and lamp type behind each fixture tag.
- Panel schedules: every circuit, its breaker size and its load.
- Single-line (one-line) diagram: the service, gear, feeders and their sizes.
- Specifications (Division 26): allowed conduit types, minimum wire size, whether MC cable is allowed, and the testing required.
- Mechanical and plumbing plans: equipment the electrician must connect (rooftop units, water heaters, pumps) that may not appear on the electrical sheets.
If the specs say “EMT in all exposed areas” and the plans show MC cable, write it down as a question. Don’t quietly pick the cheaper one.
Step 2: Count devices and fixtures (the electrical takeoff)
The takeoff starts with counts. Work through the plans one symbol at a time: count every duplex receptacle on every sheet, mark each one as you go, then move to the next symbol. Counting one symbol at a time is slower than counting room by room, but it’s far easier to check.
- Count fixtures by type tag (A, B, C…) from the fixture schedule, not just “light fixtures”. A 2x4 LED troffer and a pendant cost very different amounts to buy and to hang.
- Count boxes with their devices: each device needs a box, a mud ring or plaster ring, and a cover plate.
- Count equipment connections from the mechanical and plumbing plans.
- Use takeoff software (Bluebeam, PlanSwift, Accubid and others) or colored highlighters on paper. Either way, every symbol should end up marked so nothing is counted twice or missed.
Step 3: Measure conduit and wire
Conduit and wire are measured in linear feet, but they’re measured differently.
Conduit: measure each run along the path it will actually take, not straight across the room. Add the vertical drops: a receptacle at 18 inches off the floor, fed from a ceiling 9 ft up, has about 7.5 ft of drop on top of the horizontal run. Branch circuits on the plans are often drawn only as homerun arrows, so you’ll need to lay out the routes yourself.
Fittings follow from the conduit: - EMT comes in 10-ft lengths, so plan on one coupling per 10 ft. - Two connectors per run, one at each box. - Straps: EMT must be supported within 3 ft of each box and at least every 10 ft (NEC 358.30), so count straps from the runs, not as a guess.
Wire = conduit length × number of conductors, plus makeup. A run carrying a hot, a neutral and a ground needs three times its length in wire. Then add an allowance for the wire left in each box to make up the connection and for the waste from each pull. Keep wire separate by size and color, because that’s how it’s bought.
Step 4: Take off the gear and feeders
From the single-line diagram and panel schedules, list every piece of gear: the service entrance, switchboards, panelboards, transformers and disconnects. Count the breakers on each panel schedule, too, because a panel is often priced as a can, interior and breakers separately.
Feeders are measured like branch conduit, but they’re usually much larger: bigger conduit, bigger wire and often parallel sets. A 100-ft feeder in 2-inch conduit with four 3/0 conductors costs far more than 100 ft of branch circuit, and it often decides whether your bid wins or loses.
Step 5: Apply labor units
A labor unit is the number of hours it takes to install one unit of something: hours per receptacle, per fixture, or per 100 ft of conduit. Multiply each quantity by its labor unit and you have the labor hours for the job.
Labor hours = quantity × labor unit
Where do labor units come from?
- Published manuals. The best known is the NECA Manual of Labor Units from the National Electrical Contractors Association. Estimating software such as Accubid comes with its own labor database.
- Your own job history. Labor units from your own finished jobs are the most accurate, because they reflect your crews.
Then adjust for the job’s conditions. Published units assume normal working conditions, so add a factor for anything harder: high ceilings, an occupied building, work at night, tight schedules or difficult access. Labor hours times your burdened labor rate (wages plus payroll taxes, insurance and benefits) gives the labor cost.
Step 6: Price the material
Price the material from current supplier quotes, especially for copper wire and gear. Copper prices move, and switchgear lead times and prices change often, so last year’s numbers won’t hold. For large orders, ask your supplier for a quote with an expiry date and make your bid valid for the same period.
Add sales tax where it applies, and add a waste allowance for the small parts (fittings, wire nuts, straps) that disappear on every job.
Step 7: Add the job costs and markup
The last layer is what doesn’t show on the drawings:
- Equipment: scissor lifts, wire pullers, trenchers.
- Permits and inspections.
- Temporary power for the other trades, if it’s in your scope.
- Testing and commissioning, as the specifications require.
- Overhead and profit.
This is where you decide how to price electrical work for this particular bid. The quantities are facts; the markup is a business decision. For how to turn the estimate into a submitted bid, see our guide on how to bid a construction job.
Worked example: a small office fit-out
A 2,400 SF office suite on one floor, with a 9-ft ceiling. The electrician supplies and installs the lighting, receptacles, switches, a new 100A panel and the branch circuits in 3/4” EMT with #12 THHN copper wire.
The takeoff
| Item | Quantity |
|---|---|
| 2x4 LED troffers (type A) | 20 EA |
| Exit/emergency combo lights (type X) | 4 EA |
| Duplex receptacles, 20A | 30 EA |
| Single-pole switches | 10 EA |
| 100A panelboard | 1 EA |
| 3/4” EMT, branch runs and drops | 520 LF |
| 3/4” EMT, homeruns to the panel | 120 LF |
Fittings
| Item | Calculation | Result |
|---|---|---|
| Couplings | 640 LF ÷ 10 ft lengths | 64 EA |
| Straps | 640 LF ÷ one every 8 ft, plus one within 3 ft of each of the 64 boxes | 80 + 64 = 144 EA |
| Connectors | 2 per run, 64 runs | 128 EA |
Wire
| Item | Calculation | Result |
|---|---|---|
| Branch runs (hot, neutral, ground) | 520 LF × 3 conductors | 1,560 LF |
| Homeruns (3 circuits: 3 hots, 3 neutrals, 1 ground) | 120 LF × 7 conductors | 840 LF |
| Plus 10% for makeup and waste | 2,400 × 1.10 | 2,640 LF of #12 THHN |
Labor
The labor units below are examples to show the math, not figures from any manual. Use units from your own job history or your labor database.
| Item | Quantity | Example unit | Hours |
|---|---|---|---|
| LED troffers | 20 EA | 1.0 hr each | 20.0 |
| Exit/emergency lights | 4 EA | 0.75 hr each | 3.0 |
| Receptacles (box, device, plate) | 30 EA | 0.5 hr each | 15.0 |
| Switches (box, device, plate) | 10 EA | 0.5 hr each | 5.0 |
| 3/4” EMT | 640 LF | 4.0 hr per 100 LF | 25.6 |
| #12 THHN wire | 2,640 LF | 6.0 hr per 1,000 LF | 15.8 |
| 100A panel, set and terminate | 1 EA | 8.0 hr | 8.0 |
| Base labor | 92.4 hours | ||
| Occupied building, +10% | 101.6 hours |
At an example burdened rate of $80 an hour, that’s about $8,130 of labor. Material from supplier quotes, then equipment, permits, overhead and profit, go on top to make the bid price.
Can you estimate electrical work by the square foot?
Only as a rough budget. An electrical cost per square foot, taken from past jobs of the same type, is useful for a quick check early in design or to sanity-check a finished estimate. But it can’t see what makes this job different: a data-heavy office, a commercial kitchen, a long feeder run or high ceilings can all push the real number far away from the average. For a bid, build the estimate from a takeoff.
Common electrical estimating mistakes
- Missing equipment connections shown only on the mechanical or plumbing plans.
- Measuring conduit straight across the room instead of along its real route, and forgetting the vertical drops.
- Forgetting the wire makeup in every box.
- Counting fixtures without their type tags, so a cheap fixture gets priced where an expensive one is specified.
- Using published labor units with no adjustment for ceiling height, occupied buildings or access.
- Old copper and gear prices. Get current quotes.
- Ignoring addenda. Electrical scope changes often between bid sets. Check the date on every sheet.
Frequently asked questions
What is an electrical takeoff?
An electrical takeoff is the counted and measured list of everything on the electrical drawings: devices, fixtures, conduit and wire by size, boxes, gear and feeders. It’s the quantity half of the estimate. The estimate adds labor and material prices to those quantities.
What are electrical labor units?
A labor unit is the time it takes to install one unit of work, such as hours per receptacle or per 100 ft of conduit. Multiply each quantity in the takeoff by its labor unit to get labor hours, then multiply by your labor rate. Units come from published manuals, estimating software databases or your own job history.
How do you price electrical work?
Price the material from current supplier quotes, price the labor from labor units and your burdened labor rate, add equipment, permits and other job costs, then add overhead and profit. The takeoff quantities are the same no matter who bids; the labor productivity and markup are where bids differ.
How do I estimate wire for a conduit run?
Multiply the conduit length by the number of conductors in it, then add an allowance for makeup at each box and waste from pulling. Keep each wire size and color separate.
Get your electrical takeoff done from the drawings
Counting every device and measuring every conduit run takes hours on a real set of plans. We prepare complete electrical and MEP takeoffs from your drawings: devices and fixtures by type, conduit and wire by size, gear and feeders, delivered in 24–48 hours.
Send us your drawings.
Tell us about your project and we'll reply with a quote.
-
Send your drawings
PDF, DWG, ZIP or XLSX. Any trade, any size.
-
We measure every trade
Each takeoff is checked by a second estimator.
-
Get your takeoff
Excel quantities and marked-up plans in 24–48 hours.