Takeoffs for every trade on your drawings.
Six CSI trade groups, one estimating team, delivered in 24–48 hours.
- Trade groups
- 6 CSI groups
- Turnaround
- 24–48 hours
- Files we accept
- PDF, DWG, ZIP, XLSX
SiteWork & Civil
CSI Div. 31–33
Site and civil takeoffs covering everything that happens before vertical construction begins — from initial earthwork through finished paving and utility tie-ins.
- Cut & fill volumetric calculations
- Excavation and trenching quantities
- Site utilities — water, sewer, storm drainage
- Grading and 3D surface modeling
Concrete & Masonry
CSI Div. 03–04
Foundation-through-structure concrete and masonry quantities, verified against rebar schedules and formwork requirements for accurate bid pricing.
- Foundations, footings, slabs on grade
- Reinforcing steel (rebar) tonnage
- Formwork square footage
- CMU block and brick veneer counts
Structural & Building Envelope
CSI Div. 05–08
Structural steel, framing, and the full building envelope — the systems that carry loads and separate interior from exterior.
- Structural steel — beams, columns, connections
- Wood and steel framing takeoffs
- Roofing systems and underlayment
- Waterproofing and thermal insulation
Architectural & Interior Finishes
CSI Div. 09–12
Complete interior finish-out quantities — the trades that turn a structural shell into a finished, occupiable space.
- Drywall board counts and metal stud framing
- Acoustic ceiling tile and grid systems
- Flooring — tile, carpet, LVP, and underlayment
- Interior and exterior paint surface area
MEP & Building Systems
CSI Div. 21–28
Full mechanical, electrical, and plumbing takeoffs covering ductwork, piping, wiring, and fire/life-safety systems across a project.
- HVAC ductwork and equipment schedules
- Plumbing pipe lengths, fittings, and fixtures
- Fire suppression and sprinkler systems
- Electrical conduit runs and panelboards
Equipment & Specialty Construction
CSI Div. 13-14, 40–48
Purpose-built structures and process equipment that fall outside standard building trades — from conveying systems to special-use facilities.
- Conveying systems — elevators, escalators, lifts
- Special construction — pre-engineered buildings, fabric structures
- Process and material handling equipment
- Building specialties and furnishings quantities
Need drawings, not just numbers?
Plan drafting, fabrication-ready shop drawings and project scheduling, tied to your takeoffs.
Explore BIM Modelling
Every takeoff includes
Itemized Excel takeoff
Dynamic material worksheets, organized by CSI division and ready to price.
Marked-up drawings
Color-coded markups that show exactly what was measured and where.
Material and labor breakdowns
Unit quantities you can carry straight into your bid.
24–48 hour turnaround
Rush requests prioritized for tight bid deadlines whenever possible.
Send us your drawings.
Tell us about your project and we'll reply with a quote.
-
Send your drawings
PDF, DWG, ZIP or XLSX. Any trade, any size.
-
We measure every trade
Each takeoff is checked by a second estimator.
-
Get your takeoff
Excel quantities and marked-up plans in 24–48 hours.