Real takeoffs, every trade.
Open the same kind of takeoff we'd send you, before you send us a single drawing.
Every division
Full Building Takeoff, All Trades
Every CSI division on one commercial project, from sitework and concrete to steel, finishes and MEP, in one organized takeoff.
Open sample
Div 06
Framing Takeoff
Full material lists, hardware schedules, and stud counts.
Open sample
Div 03
Commercial Slab Estimation
Volume calculation, rebar, and formwork.
Download sample
Div 23
HVAC Ductwork Takeoff
Equipment schedule and ductwork run lengths.
Open sample
Div 09
Drywall Partition Takeoff
Gypsum boards, studs, and finish schedule.
Open sample
Div 05
Steel Detailing
Beams, columns, and fastener schedules.
Download sample
Div 31
Earthwork Volumetric
Cut & fill calculations and grading volumes.
Open sample
Div 09
Interior Painting Takeoff
Surface area calculations and finish schedules.
Open sample
Div 07
Roofing Estimation
Shingles, underlayment, and insulation quantities.
Download sample
Div 09
Flooring Takeoff
Tile, carpet, and wood flooring surface areas.
Open sample
Div 22
Plumbing Pipe Takeoff
Pipe lengths, fittings, and fixtures.
Open sample
Div 26
Electrical Takeoff
Detailed estimate of electrical components and wiring.
Open sample
Insurance claim
Xactimate Insurance Estimate
Storm and water damage scoped line by line in Xactimate format, ready for the insurance claim.
Open sample
Div 26
Electrical Bill of Materials
Every wire, conduit, box, breaker and fixture counted and listed, ready for purchasing.
Open sample
Div 01
Pre-Bid Drawings
Converted raw concepts into detail visuals of project.
Open sample
Div 01
3D Coordination
Fabrication ready shop drawings.
Open sample
Div 03
Plan scheduling
Helping Contractors to draft the timeline of project.
Open sampleSend us your drawings.
Tell us about your project and we'll reply with a quote.
-
Send your drawings
PDF, DWG, ZIP or XLSX. Any trade, any size.
-
We measure every trade
Each takeoff is checked by a second estimator.
-
Get your takeoff
Excel quantities and marked-up plans in 24–48 hours.